LOM, working alongside Galliford Try, completed this new build two storey block for Vaughan Primary School in the London Borough of Harrow. This was part of the Priority School Building Programme delivered for the Education Funding Agency (EFA).
Work took place over two phases: a new build two-storey junior block followed by the remodelling of the existing school to accommodate the infant school. The key challenge was to keep the school operational throughout the works. Another challenge was to design the junior block so that it was appropriate to the scale of the site and retained sufficient outside space for play, sports and parking.